Category: | Cycleway: A problem that needs to be fixed |
Tags: | path, soggy, surface |
Date time: | 3.54pm, Sunday 4th August, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
A newly built soggy wet path alongside the railway in the southern part of Dargavel.
Comments reflect the views of the original submitter only.