Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 1.47pm, Saturday 14th December, 2013 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | martin |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Area: | Cambridge |
Drain cover in the advance box that should be flush with the road surface on Cherry Hinton Road.
Cllrs Kavanagh and Herbert have asked officers to supply the original design for the junction which is apparently different to what has been created by the contractors.
Comments reflect the views of the original submitter only.