Category: | Cycleway: A problem that needs to be fixed |
Tags: | a7edin, acl, droppedkerb, shareduse |
Date time: | 4.36pm, Saturday 16th August, 2014 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Midlothian |
End of shared-use footway and onto the busy 50mph A7 carriageway.
Comments reflect the views of the original submitter only.