Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | bognor, ncn2, regis |
Date time: | 10.35pm, Friday 3rd January, 2014 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | cyclebognor |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Cycle Bognor - find us on facebook |
Area: | Arundel |
Bognor Regis - NCN 2 cycle route along the promenade towards Felpham, completely blocked by shingle thrown up in a winter storm. The track at this point often has shingle thrown up during high seas but its normally passable with care. It was 8 days before this route was fully useable again.
Comments reflect the views of the original submitter only.